Achieving maximum protective efficiency requires following a structured installation process where the interlocking PVC Cable Tile sections are laid continuously throughout the entire length of the dug utility trench directly above the primary bedding material. The individual tiles feature a highly efficient, integrated interlocking peg-and-slot system or a jointing mechanism that connects the separate pieces into a single, continuous, and unbroken protective shield that will not shift or separate during subsequent soil backfilling and compaction processes. As a premier manufacturer and supplier, Singhal Industries Private Limited recommends placing these safety tiles approximately 300 millimeters above the actual cables, allowing for an adequate safety buffer zone that absorbs mechanical shocks effectively during any future accidental ground surface excavations.
Read More – https://www.singhalglobal.com/products/pvc-cable-tiles